Getting ready-Diesel.

Reply
 
Thread Tools
  #1  
Old 28th August 2009, 19:12
pre65's Avatar
pre65 pre65 is offline  
Senior Member
 
Join Date: Jun 2009
Location: Ashen-North Essex/Suffolk borders.
Posts: 3,560
Images: 93
Getting ready-Diesel.

How long is the "proceedure" for getting underway from cold on a diesel loco ?

Is it just a case of starting the engine ?

Since joining this forum I have "warmed" a little to diesel locos !


Reply With Quote
  #2  
Old 28th August 2009, 20:59
klordger1900's Avatar
klordger1900 klordger1900 is offline  
Senior Member
 
Join Date: Feb 2009
Location: chelmsford
Posts: 732
Images: 27
I reckon that depends on whether the diesel is a modern state of the art job which will start at the flick of a switch or your old worn-out and much loved preservation type which require many prayers and all fingers and toes crossed. I know a class 47 that is being very temperamental at the moment!!
Reply With Quote
  #3  
Old 28th August 2009, 22:19
John H-T's Avatar
John H-T John H-T is offline
Station Manager
 
Join Date: Nov 2005
Location: Derbyshire
Posts: 6,351
Images: 528
Most of ours at Wirksworth take about half an hour by the time you have done all the checks and built up air pressure or vac.

Best wishes,

John H-T.
Reply With Quote
  #4  
Old 29th August 2009, 09:07
LesG's Avatar
LesG LesG is offline  
Senior Member
 
Join Date: May 2007
Location: Keith, NE Scotland
Posts: 284
Images: 28
Depends on the class of Loco.

If memory serves me correctly we get,

20mins to prep a class 37,47,56,60 or the older type loco's and 15mins for the newer types like the 59,66 and the 67.

A prep basically consists of a walk round to ensure no 'NOT TO GO BOARDS' are attached to the vehicle,scotches underneath anything hanging off etc. Then its up onto the loco checking each cab for track circuit clips,fire extinguishers,dets also checking the MCBs etc then a check of the engine room for oil, coolant etc obvious leaks to the system then its into the leading cab to start the loco.Once started its a case of outside to check all the lights are working,listening for air leaks and a final check outside. I then personally go back into the non working cab check the NRN radio,desk lights
and again through the engine room checking for leaks when the system is under pressure. Meanwhile the air system is building up to operating pressure and you can then check that the brakes are operating and the whistle,windsceen wipers etc. Then hopefully we can get on our merry way signallers dependant.

I must stress that this is a quick run through of a loco prep and different loco have different needs so to speak and some take longer than others to get ready.

Les
Reply With Quote
  #5  
Old 29th August 2009, 22:50
pre65's Avatar
pre65 pre65 is offline  
Senior Member
 
Join Date: Jun 2009
Location: Ashen-North Essex/Suffolk borders.
Posts: 3,560
Images: 93
Thanks gents for that insight.

I spent an hour (or two ) on You tube watching (and listening) to many and various diesel locos starting up (or trying to ).

If a car,lorry or bus made that much "clag" it would be removed from the highway pronto !

Last edited by pre65; 29th August 2009 at 22:53.
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off

Forum Jump


All times are GMT +1. The time now is 04:14.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.