11:44

Welcome to Railway Forum!
Welcome!

Thank you for finding your way to Railway Forum, a dedicated community for railway and train enthusiasts. There's a variety of forums, a wonderful gallery, and what's more, we are absolutely FREE. You are very welcome to join, take part in the discussion, and post your pictures!

Click here to go to the forums home page and find out more.
Click here to join.


Go Back   Railway Forum > News and General Discussion > Railway News from around the World

Great news for the future of mainline steam

Reply
 
Thread Tools
  #1  
Old 22nd May 2015, 20:55
Beeyar Wunby's Avatar
Beeyar Wunby Beeyar Wunby is offline  
Senior Member
 
Join Date: Dec 2012
Location: NW Norfolk
Posts: 840
Images: 4
Great news for the future of mainline steam

In the current publication of Rail (774) it says that Network Rail has moved its target date for ERTMS "50 years hence".

ERTMS requires In-Cab signalling, computer control, and a digital gateway into the train. Obviously this would be way beyond the finances of most classic locomotive owners....so ERTMS would effectively kill mainline steam.

The original roll out for this on the southern part of the ECML was to be 2021. That's going to come around pretty soon.

But now NR has effectively thrown away its "Digital Railway" plan.

So maybe it'll be 2071....or even later.

Don't rush into it NR, we don't mind waiting

BW


Reply With Quote
  #2  
Old 24th May 2015, 12:12
philw philw is offline
Member
 
Join Date: Feb 2011
Location: Alcaucin
Posts: 36
It will however be introduced on HS1 & 2 and any further extensions of the high speed system. This will allow cross-border ERTMS trains from Europe to get far into the UK so no reason to push too hard elsewhere.

The downside is of course no steam running on the HS network and through the Channel Tunnel..
Reply With Quote
  #3  
Old 25th May 2015, 10:05
Beeyar Wunby's Avatar
Beeyar Wunby Beeyar Wunby is offline  
Senior Member
 
Join Date: Dec 2012
Location: NW Norfolk
Posts: 840
Images: 4
Quote:
Originally Posted by philw View Post
It will however be introduced on HS1 & 2 and any further extensions of the high speed system. This will allow cross-border ERTMS trains from Europe to get far into the UK so no reason to push too hard elsewhere.
Interesting, thanks Phil. That's where it belongs.

I just couldn't see the economics of spending billions to make suburban rolling stock and sedate branch lines compliant with a European system. Quite apart from the massive technical installation, there would be so much EXTRA cost in just bringing vast parts of our system up to the standard where ERTMS could control it.

And since it was going to be installed a line at a time, would have made operations insane. One minute in cab signalling with linespeeds in kph, the next colour lights in mph. Sheer wackadoo politics again and I suspect that the people at the top hadn't thought it through.

Quote:
The downside is of course no steam running on the HS network and through the Channel Tunnel..
Wow. I'd pay to see Mallard run at 186 mph.

Best wishes, BW
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off

Forum Jump


All times are GMT +1. The time now is 11:44.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.