07:54

Welcome to Railway Forum!
Welcome!

Thank you for finding your way to Railway Forum, a dedicated community for railway and train enthusiasts. There's a variety of forums, a wonderful gallery, and what's more, we are absolutely FREE. You are very welcome to join, take part in the discussion, and post your pictures!

Click here to go to the forums home page and find out more.
Click here to join.


Go Back   Railway Forum > News and General Discussion > Railway News from around the World

This eye-opening process blew me away!

Reply
 
Thread Tools
  #1  
Old 29th July 2019, 02:05
Musicollector Musicollector is offline  
Member
 
Join Date: Jul 2019
Location: Calgary
Posts: 2
This eye-opening process blew me away!

https://www.youtube.com/watch?v=dRFRsKobN9I

Wow! How times have changed! Technology sure is amazing!


__________________
Harry
http://harry.cckerala.com
Reply With Quote
  #2  
Old 31st July 2019, 05:52
aussiesteve's Avatar
aussiesteve aussiesteve is offline
Senior Member
 
Join Date: Dec 2017
Location: Bathurst
Posts: 578
Images: 174
G'day Harry,
Yes, modern day track laying is far removed from the good ole days of swinging hammers and crowbars.
Continuous weld rail does provide for some benefits.
However, concrete sleepers (ties) do not sustain derailments as did the old wood sleepers.
After any derailment resulting in the concrete sleepers being cracked, and potentially going out of gauge, they must be replaced.
Twice that happened here in my region of NSW.
The double track section between Wallerawang and Tarana was converted to single in 1991 to save maintenance costs.
Not long after accomplishing that, by using similar equipment seen in your video clip, a derailment occurred.
To hide the problem, ballast was hurled over the cracked sleepers.
But, eventually them sleepers had to be replaced as they began to go out of gauge.
And, down at the start of the Sydney Metrop inner region on the Main West at Emu Plains, a freighter derailed on newbie concrete sleepers.
I laughed every time that I rattled past on the quickly replaced track at the piles of concrete sleepers piled up.
Thousands of them cracked sleepers remaining along the boundary fence for some time.
So, while wood has become uneconomic, it did at least resist derailments more than does concrete.
And, the foray into steel sleepers here in regional areas also posed some dramas with derailments.
The steel sleepers bending and needing replacement.
Also, steel sleepers tend to heat up the rails more and present potential buckled track in heat.
Steve.
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off

Forum Jump


All times are GMT +1. The time now is 07:54.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.