Barmouth Viaduct shuts for £25m renovation

Reply
 
Thread Tools
  #1  
Old 16th October 2020, 09:26
pre65's Avatar
pre65 pre65 is offline  
Senior Member
 
Join Date: Jun 2009
Location: Ashen-North Essex/Suffolk borders.
Posts: 3,560
Images: 93
Barmouth Viaduct shuts for £25m renovation

A Grade II listed viaduct will shut on Friday for a £25m renovation project to begin.

Rather than face one long closure, Barmouth Viaduct will close three times for short periods.

The entire length of track on the structure will be replaced, along with a large number of the timber and metal elements.

Built in 1864 and 2,690ft (820m) long, Network Rail says Barmouth is its only major timber‐built bridge still in use.

https://www.bbc.co.uk/news/uk-wales-54557539


__________________
Philip.
Reply With Quote
  #2  
Old 22nd October 2020, 12:02
Master Cutler's Avatar
Master Cutler Master Cutler is offline  
Senior Member
 
Join Date: Jan 2011
Location: Mansfield Notts
Posts: 511
Many thanks for this Philip, hope you don't mind but I've shared it with the North Wales Nostalgia group on Facebook with acknowledgement to rf.net.
Reply With Quote
  #3  
Old 31st October 2020, 23:49
27vet's Avatar
27vet 27vet is offline  
Senior Member
 
Join Date: Feb 2010
Location: On the Equator, dang hot!
Posts: 556
Images: 84
This looks like quite an undertaking, but absolutely necessary. I followed the renovations to the Watercress Line in recent months during my travels there, and even those were a lot of work Sadly this covid fiasco has left us enthusiasts high and dry...
__________________
Hindsight is what you see from the guard's van
Reply With Quote
  #4  
Old 1st November 2020, 10:39
TRP's Avatar
TRP TRP is offline  
Senior Member
 
Join Date: Feb 2009
Location: Hastings & St Leonards
Posts: 5,112
Images: 2976
This first initial closure has been extended by 48 hours to 05:30 on Wednesday 4th November - Network Rail are taking advantage of low passenger/traffic volumes due the current 'Firebreak' lockdown in Wales to complete extra work in this first closure period.

https://www.railadvent.co.uk/2020/10...announced.html

Tony
Reply With Quote
  #5  
Old 6th November 2020, 11:38
TRP's Avatar
TRP TRP is offline  
Senior Member
 
Join Date: Feb 2009
Location: Hastings & St Leonards
Posts: 5,112
Images: 2976
Network Rail have reported the successful completion of Phase 1 of the Barmouth Bridge restoration:
https://www.networkrailmediacentre.c...n-is-completed
The second of three planned closures is scheduled for 17th September 2021.

Tony
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off

Forum Jump


All times are GMT +1. The time now is 20:27.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.