03:48

Welcome to Railway Forum!
Welcome!

Thank you for finding your way to Railway Forum, a dedicated community for railway and train enthusiasts. There's a variety of forums, a wonderful gallery, and what's more, we are absolutely FREE. You are very welcome to join, take part in the discussion, and post your pictures!

Click here to go to the forums home page and find out more.
Click here to join.


Go Back   Railway Forum > News and General Discussion > Railway News from around the World

Rother Valley Railway - important update

Reply
 
Thread Tools
  #1  
Old 13th May 2018, 22:16
TRP's Avatar
TRP TRP is offline  
Senior Member
 
Join Date: Feb 2009
Location: Hastings & St Leonards
Posts: 5,112
Images: 2976
Rother Valley Railway - important update

This is a little late in posting here, but the Rother Valley Railway have taken the next step in restoring the "missing link" of the Kent & East Sussex Railway.
On 19th April, the application for the Transport Works Act Order was submitted to the Secretary of State for Transport - the granting of this order would pave the way for the restoration of track between Northbridge Street, Robertsbridge and the current K&ESR railhead at Junction Road. The order would allow the RVR to do anything necessary to restore the track - in this case this includes all necessary works to install 3 level crossings and also compulsory purchase order powers in relation to 2 sections of former trackbed which the land owners (farmers) do not want to sell.
The Rother Valley Railway has been supported by Network Rail, the National Trust, local tourism agencies, Rother District Council and local MPs.
However, there is some vociferous opposition from the farmers & there supporters, as they say having the railway crossing there land would leave them with unworkable strips of land - this is despite the fact that the railway has been there before (with which the previous farmers managed to find workable solutions) and that there are a number of other farms along the current K&ESR between Tenterden & Bodiam which have user worked crossings to access all parts of their farmland. This aspect of the story has attracted considerable coverage in local and national media, much of this focusing on the farmers who say they will have their land "stolen" from them.

http://www.dailymail.co.uk/news/arti...n-project.html

Another aspect of the plan which has been met with opposition is the planned level crossing of the A21 Robertsbridge bypass. The crossing of the original A21 (before the bypass was built) was the reason why the K&ESR was refused permission to run to Robertsbridge when the society was formed in the 1960s. A number of groups and individuals have complained that putting a level crossing on the Robertsbridge bypass would cause unnecessary and unacceptable delays, but many of them have exaggerated the claims, whilst ignoring the fact that there is a pedestrian crossing about 100 yards up the road which already regularly stops the traffic - and that is available to use 24 hours a day, 365 days a year.

https://www.hastingsobserver.co.uk/n...lans-1-8494149

The supporters of the RVR project point to the boost to tourism with a direc rail link to the national network at Robertsbridge, particularly for visitors to Bodiam Castle. This in turn could relieve the local roads of vehicles as more people use the train instead. It could also provide a public transport link for residents of Tenterden, Northiam etc. via Robertsbridge.
And purely for the K&ESR, the addition of the link to Network Rail should increase visitor numbers, as happened with the Bluebell Railway when the extension to East Grinstead opened in 2013.

Tony


Reply With Quote
  #2  
Old 10th May 2023, 21:03
TRP's Avatar
TRP TRP is offline  
Senior Member
 
Join Date: Feb 2009
Location: Hastings & St Leonards
Posts: 5,112
Images: 2976
RVR TWO approved!

The Secretary of State for Transport has announced his decision to give approval for the Rother Valley Railway's application for a Transport & Works Order to reinstate the railway between Robertsbridge & Bodiam. This follows a Public Inquiry held between 6 July 2021 & 4 August 2021, and 2-3 September 2021.

The line is to be built under the auspices of the Rother Valley Railway, but once complete the Robertsbridge-Bodiam section will be incorporated into the current Kent & East Sussex Railway, creating a 13.5 mile railway between Robertsbridge & Tenterden.

The full document outlining the decision is here:
https://assets.publishing.service.go...ion-letter.pdf

Tony
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off

Forum Jump


All times are GMT +1. The time now is 03:48.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.