21:52

Welcome to Railway Forum!
Welcome!

Thank you for finding your way to Railway Forum, a dedicated community for railway and train enthusiasts. There's a variety of forums, a wonderful gallery, and what's more, we are absolutely FREE. You are very welcome to join, take part in the discussion, and post your pictures!

Click here to go to the forums home page and find out more.
Click here to join.


Go Back   Railway Forum > Railway Modelling > Railway Modelling

My Modular Layout

Reply
 
Thread Tools
  #1  
Old 30th December 2011, 23:09
John H-T's Avatar
John H-T John H-T is offline
Station Manager
 
Join Date: Nov 2005
Location: Derbyshire
Posts: 6,351
Images: 528
My Modular Layout

Together with other members of my Model Railway Club I am building a module for the club's new moduler layout. As always things moved slowly at first so although I started gathering materials together in July, my idea for a Brewery Layout has already appeared in Model Rail and Model Rail Live produced by Chris Nevard. At least I was able to pinch one or two of his ideas including the wagon turntable! (represented on the last photo by a square of white paper.)

Progress was also slowed down while we reached a decision on the size of each module and how the modules had to meet. One main line is on the centreline and the other offset by 50 mm. The boards are 1100mm by 400mm.

I like to plan full size starting with a sheet of wallpaper backing paper and then progressing to the base boards once they were built. I have decided to have a second board behind the main board to give more depth. The layout can also be self contined with two short fiddle yards.

I wanted the loop to be capable of handling a four wagon train plus brakevan pulled by an 0-6-0T. Brewery shunters are a Hornby L&Y Pug and a Model Rail Sentinel, which allows wagons to be shunted into the brewery two at a time.

The first 3 photos show planning at the paper stage and the last two on the boards. The final photo after I can given the boards a coat of brown emusion paint. I decided to lay one sheet of cork on the front board covering the whole area where track is to be laid. The last photo shows planning to find where the cork will be trimed, hence the masking tape to prevent the cork sticking to the baseboard where it is not required.

Best wishes,

John H-T.
Attached Images
File Type: jpg PA127054RF.jpg (58.7 KB, 44 views)
File Type: jpg PA137061RF.jpg (58.8 KB, 39 views)
File Type: jpg PB037438RF.jpg (69.9 KB, 39 views)
File Type: jpg PB107459RF.jpg (96.7 KB, 67 views)
File Type: jpg PC057466RF.jpg (81.6 KB, 58 views)


__________________
Ecclesbourne Valley Railway.
LMS Patriot Group.
LMS Carriage Association.
Belper Model Railway Group.
Reply With Quote
  #2  
Old 31st December 2011, 12:41
Madcaravanner's Avatar
Madcaravanner Madcaravanner is offline  
Senior Member
 
Join Date: Nov 2010
Location: Chesterfield, Derbyshire
Posts: 977
Images: 140
Interesting

Wish I had some spare cash would love to build an exhibition layout got some ideas but not the cash
Think Industrial sidings with mainline and loop with cripple siding as Clay Cross about 40 years ago
__________________
Regards
Gray
The wheelchair Paparazzi

https://www.flickr.com/gp/grays_photos/6P1643
Reply With Quote
  #3  
Old 31st December 2011, 18:01
Silver Fox Phil's Avatar
Silver Fox Phil Silver Fox Phil is offline  
Senior Member
 
Join Date: Jun 2010
Location: Derby
Posts: 2,001
Images: 195
Looks very interesting John and I am very much looking froward to watching progress. I am not a modeler myself but I do enjoy looking at them. Thanks for sharing.
Regards
Phil
Reply With Quote
  #4  
Old 31st December 2011, 22:09
swisstrains's Avatar
swisstrains swisstrains is offline  
Senior Member
 
Join Date: Oct 2005
Location: England
Posts: 4,149
Images: 538
Another interesting project John.
How's the "Will Valley Railway" and your On30 logging layout progressing?
__________________
John …….My Railwayforum Gallery
Reply With Quote
  #5  
Old 1st January 2012, 17:46
John H-T's Avatar
John H-T John H-T is offline
Station Manager
 
Join Date: Nov 2005
Location: Derbyshire
Posts: 6,351
Images: 528
Both the Will Valley Railway and the 0N30 layouts have suffered because of commitments at the EVR and the later is very much on the back burner. The Modular layout is getting me going again as it is part of club activities and I hope that the Will Valley Layout will benifit.

Here is an update on progress on the Modular Layout:

Track laying is complete on the front board and all that is left to do is the siding into the Brewery itself, which requires a wagon turntable. I have the kit.

The next job is to wire up the point motors and put in track feeds. The layout is going to be DCC.

The small unpainted board is the jig to ensure that baseboards line up.

I am looking at the possibility of a road over bridge at the right hand end hence the "structure". It would act as as scenic break between the neighboughing module.

Photo of my new NRM Compound to finish.

Happy New Year.

John H-T.
Attached Images
File Type: jpg P1017470RF.jpg (83.8 KB, 43 views)
File Type: jpg P1017478RF.jpg (105.6 KB, 44 views)
File Type: jpg P1017479Rf.jpg (166.0 KB, 53 views)
File Type: jpg P1017469RF.jpg (79.7 KB, 50 views)
__________________
Ecclesbourne Valley Railway.
LMS Patriot Group.
LMS Carriage Association.
Belper Model Railway Group.
Reply With Quote
  #6  
Old 2nd January 2012, 20:22
Silver Fox Phil's Avatar
Silver Fox Phil Silver Fox Phil is offline  
Senior Member
 
Join Date: Jun 2010
Location: Derby
Posts: 2,001
Images: 195
Looking really keen now and I love the shot of the Compound. Good stuff
Regards
Phil
Reply With Quote
  #7  
Old 3rd January 2012, 03:25
saxokid's Avatar
saxokid saxokid is offline  
Senior Member
 
Join Date: Oct 2009
Location: wirral
Posts: 438
Images: 171
Interesting little stup you have John.....
Reply With Quote
  #8  
Old 15th January 2012, 22:47
John H-T's Avatar
John H-T John H-T is offline
Station Manager
 
Join Date: Nov 2005
Location: Derbyshire
Posts: 6,351
Images: 528
A quick up update on progress. I have finished the basic wiring so it should be possible to run trains through to neighbouring modules. Will find out at Club on Wednesday!

All the droppers have been wired up to the bus which is copper tape round 3 sides of the board and also to the sockets for connecting to the next module.

I am trying a system used by another club member: wiring the droppers to copper clad sleepers stuck to the underside of the board and then from there to the bus. Should make trouble shooting easier.

Two photos: one of the wiring on the underside and one of the front board without stock so that the track layout is more obvious. Track still needs to be laid onto the back board, but I need to make the wagon turntable before I can do that.

The groups of three copper clad sleepers are for wiring the seep point motors, which will be the next task once the current wiring has been proved!

Best wishes,

John H-T.
Attached Images
File Type: jpg P1157502rf.jpg (84.3 KB, 30 views)
File Type: jpg P1157505rf.jpg (59.0 KB, 27 views)
__________________
Ecclesbourne Valley Railway.
LMS Patriot Group.
LMS Carriage Association.
Belper Model Railway Group.
Reply With Quote
  #9  
Old 16th January 2012, 20:01
springs branch mickey's Avatar
springs branch mickey springs branch mickey is offline  
Senior Member
 
Join Date: Jun 2009
Location: blackpool
Posts: 624
Images: 76
Looks very good John. I can't build for toffee.
mickey
__________________
Treat every day like it's your last. One of these days you'll be right.
Reply With Quote
  #10  
Old 17th January 2012, 09:05
John H-T's Avatar
John H-T John H-T is offline
Station Manager
 
Join Date: Nov 2005
Location: Derbyshire
Posts: 6,351
Images: 528
Quote:
Originally Posted by springs branch mickey View Post
Looks very good John. I can't build for toffee.
mickey
The big advantage of this project is that the module is very portable so I can take it to the club and get help from other members, so I get help and learn.

I have now tested the whole layout and it is all live. Two joints had to be resoldered and two extra droppers fitted. I used a Pullman Coach with lights for initial testing before putting a loco on the track. I have now had a loco run on all the tracks.

Best wishes,

John H-T.
__________________
Ecclesbourne Valley Railway.
LMS Patriot Group.
LMS Carriage Association.
Belper Model Railway Group.
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off

Forum Jump


All times are GMT +1. The time now is 21:52.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.