RAIB report into Northern City Line tunnel drill bit incursion

Reply
 
Thread Tools
  #1  
Old 20th February 2014, 11:44
Beeyar Wunby's Avatar
Beeyar Wunby Beeyar Wunby is offline  
Senior Member
 
Join Date: Dec 2012
Location: NW Norfolk
Posts: 840
Images: 4
Post RAIB report into Northern City Line tunnel drill bit incursion

Yes the RAIB report is out. Linky here....Northern City Line report

This is the line of the original Moorgate Disaster.

It seems incredible that this could happen in the heart of London, but then as we say on the railway - "if it can happen, it WILL happen eventually".

If you remember what happened, a train driver spotted water pouring from the roof of the single bore tunnel and reported it to the signaller. The bobby cautioned the driver of the following train and told him to inspect the line - he managed to stop short of two wapping great drill bits lying across the the 3rd rail and a running line.

This is one of the busiest commuter routes into the heart of London, and the Class 313 stock is some of the oldest in the country. The derailment of a full train would certainly have caused significant injuries and possibly fatalities. Rescue operations in the tight single-bore tunnel would have been very difficult.

A construction company was piling in preparation for building a 7 storey block of flats, and NOBODY was aware that there was a tube tunnel 13 metres below.

The investigation outlines a whole comedy of errors and 'not my job, guv' attitude of local government and the building industry. Because the line doesn't appear in OS maps, and belongs to Network Rail and not TfL it was forgotten about in all planning applications and searches.

Quote:
Originally Posted by RAIB report
Immediate cause
Piling operations penetrated the tunnel lining and obstructed the track

Casual factors
a. The client did not appreciate the significance of an entry in the Land Registry Property Register

b. searches undertaken on behalf of the client prior to it purchasing the site did not include Network Rail

c. a 1967 undertaking by the London Borough of Hackney, intended to give the tunnel owner the right to approve any proposed development did not result in Network Rail being consulted before piling commenced

d. the structural engineer and contractors did not identify that an obstruction found in an exploratory borehole was was part of a railway tunnel

e. pre-constrution documentary searches did not detect the presence of tunnels, or the need for additional searches

f. the planning approval did not recognise the tunnel risk
I guess this is a product of the 'modern way'

1. The buck being passed round different consultants
2. Everything being done in a hurry
3. Everything being done at the cheapest quote rather than comprehensively

Thank goodness nobody was hurt.


Reply With Quote
  #2  
Old 20th February 2014, 17:54
Tony Tony is offline  
Senior Member
 
Join Date: Oct 2008
Location: Guardamar del Segura, Spain.
Posts: 1,185
Images: 9
I do hope that the developers get the bill for the tunnel repairs. It is their responsibility to ensure that all possible checks have been carried out. They probably have a good case against their legal advisers for negligence.
Reply With Quote
  #3  
Old 21st February 2014, 03:58
jayar jayar is offline
Senior Member
 
Join Date: Jan 2009
Location: France
Posts: 226
What an amazing report, and hopefully all recommendations are incorporated - thank you for posting, Beeyar Wunby.
Reply With Quote
  #4  
Old 21st February 2014, 11:02
D.O.G.F.A.N.'s Avatar
D.O.G.F.A.N. D.O.G.F.A.N. is offline  
Senior Member
 
Join Date: Mar 2011
Location: Salford
Posts: 770
Images: 552
If you want to see these reports just log into the RAIB website and they will send you every report with no spam or adverts. Easy.
Stuart
Reply With Quote
  #5  
Old 21st February 2014, 12:08
pbowler's Avatar
pbowler pbowler is offline  
Senior Member
 
Join Date: Jan 2012
Location: Small village north of Nottingham
Posts: 476
Images: 187
Its a good thing it happened really, just think what the outcome might have been if the 7 storey block had been built putting all that extra loading on top of the tunnel. Instead of a relatively minor incident there could have been a major disaster!
Reply With Quote
  #6  
Old 23rd February 2014, 19:55
Beeyar Wunby's Avatar
Beeyar Wunby Beeyar Wunby is offline  
Senior Member
 
Join Date: Dec 2012
Location: NW Norfolk
Posts: 840
Images: 4
Quote:
Originally Posted by Tony View Post
I do hope that the developers get the bill for the tunnel repairs. It is their responsibility to ensure that all possible checks have been carried out. They probably have a good case against their legal advisers for negligence.
Yes - anybody who has ever bought a house knows the importance of paying to have a throrough search carried out before you part with your hard-earned cash. Otherwise you could be buying a monster.

I guess that whoever did this search will find themselves being sued by the development company. The Moorgate line tunnels (GN side) were built 110 years ago, and since then it has not been feasible to sink piles very far into the ground on this property. Considering that the rail tunnel is 13 metres below the surface and the structural engineers want to drive piles down to 21 metres, it rather looks like the project is essentially a lemon.

Does anyone know a good firm of litigators ?

Last edited by Beeyar Wunby; 23rd February 2014 at 19:57.
Reply With Quote
  #7  
Old 24th February 2014, 12:53
pbowler's Avatar
pbowler pbowler is offline  
Senior Member
 
Join Date: Jan 2012
Location: Small village north of Nottingham
Posts: 476
Images: 187
Looks like the only people that are going to make a profit on this project will be lawyers.
Reply With Quote
Reply

Tags
augers, derail, drill bits, northern city line, single bore tunnel


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off

Forum Jump


All times are GMT +1. The time now is 07:35.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.