Old 6th March 2012, 18:32
keith morgan keith morgan is offline
Senior Member
 
Join Date: Aug 2011
Location: Stafford (ex-wolverhampton)
Posts: 277
11 coach pendolino.

Seen at Stafford station today, the brand new 11 coach pendo, it was being dragged by a class 57(i think, i'm not too good on diesel classes) it terminated at Stafford, ran round, then went back to Longsight.
I would like to know why this exercise is carried out?, i don't think the pantograph's had been fitted to the stock, so no power.
Also could anyone tell me where this train was built and who built it?


Reply With Quote
  #2  
Old 6th March 2012, 21:16
ianrail ianrail is offline  
Senior Member
 
Join Date: Nov 2009
Location: Reading
Posts: 327
This is interesting. I'd not heard of plans to lengthen the Pendolinos, though more capacity is urgently needed. Does anyone know if they've increased the power of the engines or, if not, whether they'll have enough power to maintain existing schedules?
Reply With Quote
  #3  
Old 6th March 2012, 22:05
johnmoly johnmoly is offline  
Senior Member
 
Join Date: Nov 2008
Location: Liverpool
Posts: 149
Quote:
Originally Posted by ianrail View Post
This is interesting. I'd not heard of plans to lengthen the Pendolinos, though more capacity is urgently needed. Does anyone know if they've increased the power of the engines or, if not, whether they'll have enough power to maintain existing schedules?
Alstom built a new train shed at Edge Hill sidings in Liverpool for the express purpose of inserting two extra cars. The new cars are landed at Liverpool docks and transported the short distance to Edge Hill by road. I saw two 11 car sets on the sidings outside last year and again one last week. Don't travel that section of the line often so assume must more completed. Don't believe the power cars have changed so take it they must have the power already.
Increases capacity to 598 pax. At least 31 trains to be increased to 11 cars that serve the WCML.
Reply With Quote
  #4  
Old 7th March 2012, 15:52
hairyhandedfool hairyhandedfool is offline  
Senior Member
 
Join Date: Mar 2008
Location: MANCHESTER
Posts: 272
Images: 6
There are two things happening, firstly there is an increase in the numbers of class 390 units by four (390054-390057), of which three are already in the country. Secondly, 31 of the existing 52 Pendolinos will be extended to 11 car units with the addition of a motor and trailer coach (IIRC).

The first two new Pendolinos have temporaily been reduced to 9 car and have entered service to allow better use of the 390 and 221 fleet. Due to platform lengths they couldn't be used as the 11 car unit.

The current Pendelinos have 7 out of the 9 coaches powered and this will increase to 8 out of 11 with the new coaches (IIRC).
__________________
REAL LIFE FACT: 3,000 people die each year putting their trousers on!

Well done for making it past that today!
Reply With Quote
  #5  
Old 16th March 2012, 15:28
Alan Fry Alan Fry is offline
Member
 
Join Date: Mar 2012
Location: SW1X 7XL
Posts: 4
Could they add further cars to the Class 390 to add capacity?
Reply With Quote
  #6  
Old 16th March 2012, 16:41
NYM's Avatar
NYM NYM is offline  
Member
 
Join Date: Jan 2012
Location: By the frozen stream where the alligators swim
Posts: 24
Images: 93
Aren't the insurers something to do with the 11 coach units being temporarily reduced to 9 coaches? They won't allow two 11 coach units to pass each other. Or something.
__________________
In the pantomime of life, I'm behind you.
Reply With Quote
  #7  
Old 21st March 2012, 10:03
johnmoly johnmoly is offline  
Senior Member
 
Join Date: Nov 2008
Location: Liverpool
Posts: 149
Another 11 car Pendolino in the sidings at Edge Hill yesterday. It all looked brand new but assume some cars have been refurbished. Caught a glimpse of two cars in siding alongside Alstom train shed.
Reply With Quote
  #8  
Old 22nd March 2012, 13:23
keith morgan keith morgan is offline
Senior Member
 
Join Date: Aug 2011
Location: Stafford (ex-wolverhampton)
Posts: 277
Re. Pendolino's. Two questions ---- is it correct that 11 coach Pendo's are not allowed to pass each other? i don't understand why!
also i was told that each Pendo 11 coach train costs 30 million pounds! is this correct?
Reply With Quote
  #9  
Old 22nd March 2012, 21:49
johnmoly johnmoly is offline  
Senior Member
 
Join Date: Nov 2008
Location: Liverpool
Posts: 149
Quote:
Originally Posted by keith morgan View Post
Re. Pendolino's. Two questions ---- is it correct that 11 coach Pendo's are not allowed to pass each other? i don't understand why!
also i was told that each Pendo 11 coach train costs 30 million pounds! is this correct?
I've searched the internet and I can't find any subject on the matter as to not being able to pass each other. Its only an extra 2 cars, whats the difference in air pressure compared to 9 cars.
Reply With Quote
  #10  
Old 22nd March 2012, 21:55
ianrail ianrail is offline  
Senior Member
 
Join Date: Nov 2009
Location: Reading
Posts: 327
Quote:
Originally Posted by keith morgan View Post
Re. Pendolino's. Two questions ---- is it correct that 11 coach Pendo's are not allowed to pass each other? i don't understand why!
also i was told that each Pendo 11 coach train costs 30 million pounds! is this correct?
I can't believe that such an operational constraint (two 11 coach trains not being able to pass) is possible but unfortunately I could quite easily believe the eye-watering cost of the train. What did the PM say the other day? Something to the effect that we have the most expensive rail fares in Europe but the railway still requires the highest subsidies in Europe yet provides pretty poor service: quite an achievement.
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off

Forum Jump


All times are GMT +1. The time now is 21:57.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.