Merseyrail Punctuality Figures

Reply
 
Thread Tools
  #1  
Old 5th October 2014, 20:26
SheffStudent SheffStudent is offline  
Member
 
Join Date: Oct 2014
Location: Sheffield
Posts: 1
Merseyrail Punctuality Figures

Hi,
I am a student current studying in Sheffield and I am looking for some clarification on some figures.

My issue is with the figures that state Merseyrail is frequently among the top performing operators for punctuality in the country.

http://www.networkrail.co.uk/about/performance/
http://www.liverpoolecho.co.uk/news/...ompany-3347168

http://www.passengertransport.co.uk/...tuality-claim/

My two questions are;

Can someone explain the difference between RTP and PPM, mentioned in the third link.

RTP = Right Time Performance (percentage of trains arriving early or
within 59 seconds of schedule) over year to December 8, 2012.
PPM = Public Performance Measure over year to December 8, 2012.

And if there many be factors which push these figures up to such a high standard, such as train cancellations not being included.

I am originally from Merseyside and based on personal experience, recently viewed twitter pages such as #Merseyfail and #MiseryRail, I am very sceptical of these figures.

Any help would be brilliant but anything that is sourced, especially by Journals or credible newspapers would be more useful.

Thanks


Reply With Quote
  #2  
Old 6th October 2014, 09:42
johnmoly johnmoly is offline  
Senior Member
 
Join Date: Nov 2008
Location: Liverpool
Posts: 149
Well, I can't answer your queries, but, I use the Merseyrail network nearly every day, since 2006, and 99% of the time they are punctual. Even when a train will be one minute late the platform electronic information panel will say so. The MiseryRail nickname stands for the overcrowding on the peak services where they do not have enough carriages to satisfy demand, something they are working on for the new stock, whenever that will be !
As they run nearly 800 trains per weekday, I think it's a good service.
Reply With Quote
  #3  
Old 9th October 2014, 12:15
Beeyar Wunby's Avatar
Beeyar Wunby Beeyar Wunby is offline  
Senior Member
 
Join Date: Dec 2012
Location: NW Norfolk
Posts: 840
Images: 4
RTP is exactly what it says - the percentage of trains within the time slot.

PPM contains an element of weighting, so that different TOCs with very different routes/traction/services can be compared with each other. It also takes into account Failures and Cancellations.

The significance of the PPM is that is used as an indication of how well a TOC is performing in terms of its franchise commitment.

HTH
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off

Forum Jump


All times are GMT +1. The time now is 19:23.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.