09:17

Welcome to Railway Forum!
Welcome!

Thank you for finding your way to Railway Forum, a dedicated community for railway and train enthusiasts. There's a variety of forums, a wonderful gallery, and what's more, we are absolutely FREE. You are very welcome to join, take part in the discussion, and post your pictures!

Click here to go to the forums home page and find out more.
Click here to join.


Go Back   Railway Forum > General Railway Discussion > Passenger Operations and Observations

TGV questions.

Reply
 
Thread Tools
  #1  
Old 22nd September 2012, 00:21
keith morgan keith morgan is offline
Senior Member
 
Join Date: Aug 2011
Location: Stafford (ex-wolverhampton)
Posts: 277
TGV questions.

I have just returned from holiday on the Costa Brava, Spain, thought i would do it differently this year and travelled by train.
The Eurostar arrived in Paris on time, we then crossed the city to join our TGV train at Gare de Lyon, the TGV never ceases to amaze me, not only its speed but its smooth running.
This service is planned in the future to run to Barcelona, but at the moment terminates at Figueres Vilafant, which was opened in Jan. 2012.
I have two questions to ask ------ has anyone any info when the link will be completed to Barcelona, also the new track appears to have a single concrete block supporting the rail and chair instead of a right across traditional sleeper, how is any creep controlled? could there be a tie rod joining the blocks which is buried under the ballast? your help please!


Reply With Quote
  #2  
Old 22nd September 2012, 18:37
Ploughman Ploughman is offline  
Senior Member
 
Join Date: Dec 2009
Location: York
Posts: 333
The sleepers are quite usual for all TGV lines and are called Twinblock.
There is a tie bar between the concrete sections.
3 links below.
http://www.railway-technology.com/co...radetech2.html
http://www.stanton-bonna.co.uk/main....rent_news_twin
http://www.pandrol.com/images/upload...304_p12-13.pdf
__________________
Bryan

http://www.yorkareagroup.co.uk/
Reply With Quote
  #3  
Old 22nd September 2012, 20:40
swisstrains's Avatar
swisstrains swisstrains is offline  
Senior Member
 
Join Date: Oct 2005
Location: England
Posts: 4,149
Images: 538
Hi Keith,
I see that Bryan has answered your question about the concrete twinblock sleepers.

I believe that the HS line between Figueres and Barcelona was originally planned to open in December 2012 but according to a news item in the latest "Today's Railways Europe" there is still quite a bit of work to be done. A 10 month contract for a new station in Girona was only awarded in August and work on a 7 month contract to lay 12.7 km of track in the Barcelona suburbs has only just started.
__________________
John …….My Railwayforum Gallery
Reply With Quote
  #4  
Old 23rd September 2012, 22:19
keith morgan keith morgan is offline
Senior Member
 
Join Date: Aug 2011
Location: Stafford (ex-wolverhampton)
Posts: 277
Thank you both for your replies, much appreciated.
I travelled by coach to Barcelona, and from the motorway i could see there is much work to be done installing track, although there appears to be a single line completed.
I also spotted a lone class 66 on the French side of the border, i'm not sure of the location.
Reply With Quote
  #5  
Old 25th September 2012, 16:46
dave55uk dave55uk is offline  
Member
 
Join Date: Dec 2005
Location: Stevenage
Posts: 13
Have just watched the "Video 125" production of the TGV cab ride from Marseilles to Paris. The commentary made mention of the trains running at a 4 minute headway. Now, roughly calculating, they 'do' about 3 miles a minute, so at the above headway, that's something like 12 miles. That's a big gap between trains. Wouldn't a 2 minute headway (6 miles approx.) be perfectly safe? Even at the speeds the TGV's do, surely they can stop well within 6 miles.
Reply With Quote
  #6  
Old 26th September 2012, 07:57
keith morgan keith morgan is offline
Senior Member
 
Join Date: Aug 2011
Location: Stafford (ex-wolverhampton)
Posts: 277
Crikey Dave, well done for working out the logistics, my own personal view is that 6xmins is fine!! any shorter than that would take super braking power.
The TGV's speed is deceptive, as a passenger you have no idea how fast the train is going.

While on the subject of speed, how things have changed,------ i travelled by train from northern Spain, leaving at 10.20am and arrived home in Stafford at 11.25pm!! including 3xhours changing trains in Paris, ------- 30 years ago people would have laughed at you if you had even suggested this.
Reply With Quote
  #7  
Old 26th September 2012, 15:13
dave55uk dave55uk is offline  
Member
 
Join Date: Dec 2005
Location: Stevenage
Posts: 13
In the aforementioned video, I believe they said the line was at capacity. I've done that very route, Marseille to Paris, non-stop, but on one of the single deck TGV's. (If memory serves me right, it was one of the orange ones). I still think a TGV at full tilt could stop comfortably within 6 miles.
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off

Forum Jump


All times are GMT +1. The time now is 09:17.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.